Railway in Algeria

International

Works in progress

Tlélat-Tlemcen, Algeria

Work start

2008

End of worls

Works in progress

The work consists of the construction of 132 km of double-track electrified high-speed railway line with 17 km of viaducts, a tunnel and a station, in addition to technological works such as armament, telecommunications, signalling and electrification.

The works under the responsibility of the Parent Company Condotte extend for 99 km of route and
are characterized by 38 viaducts for a total of 12 km, 27 upper passages and 8 lower passages andconnected roads and a 650-meter-long tunnel.

Work will be completed on the new 130 km railway line between Tlelat and Tlemcem by September 2027. The contract between ANESRIF, the railway investment agency of the Algerian Department of Public Works and Transport, and the Condotte – Rizzani De Eccher consortium dates to 2008.

 

The video was made by ANESRIF, a railway investment Agency of the Algerian Department of Public Works and Transport, which commissioned the works carried out and in progress by Condotte 1880, the group leader for construction of the work, which includes viaducts and tunnels.