Motorway, tunnels and viaducts , Taiwan

International

Works completed

Taipei-Ilan, Taiwan

Category

Road Works

Work start

1988

End of worls

2002

Construction of a road lot 6,000 m long including 2 parallel tunnels 3,860 m long each with an
internal diameter of 12 m, viaducts for a total length of 1,600 m