The work consists of the lengthening and widening of the existing Garibaldi pier, with the insertion of approximately 8,200 tons of anchored sheet piles and the filling of approximately 450,000 cubic meters of inert material, for the creation of a further 45,000 square meters of outdoor squares inside the commercial port of La Spezia.